Calculate Simply · All tools

Grey Structure Cost Calculator 2026 for Lahore, Gujranwala & Sialkot

Compare Budget, A Quality and Premium rates and print your grey structure BOQ.

Step 1 · Enter your plot depth

Enter 0 if your plot is level with the road. Enter your plot depth to unlock the BOQ options.

House configuration

How covered area is estimatedUses 225 sq ft per marla. Floor areas are budgeting assumptions. The 5 marla example uses 800 + 800 + 300 sq ft. The 1 kanal example uses 65% each for ground and first, plus a 300 sq ft allowance when selected. Actual permitted coverage and floors depend on the authority, scheme, phase, plot dimensions and setbacks. The second-floor allowance is a costing input.References: LDA · DHA Lahore · CDA. Available material quantities scale from the DHA Phase 8 reference BOQ (5,273 sq ft).

Choose materials

Tap a material option to include it.

Coming Soon

The Lahore Finishing BOQ is coming soon.

This is a tentative BOQ. Quantities, rates and scope may change when the structural design or project location varies. Islamabad and Rawalpindi require a separate, site-specific BOQ.

Brick Constructions

Order waterproofing products and construction materials in Lahore and across Punjab, or discuss your house design or construction project.

WhatsApp for materials WhatsApp for design or construction +923390004805

Practical guide

Build a grey structure construction budget by quantity and unit rate. Use the calculator above to compare the scope and cost of a 5 marla, 10 marla or 1 kanal house before requesting contractor quotes.

How to build an itemised house BOQ

Enter the plot depth below road level, choose the plot size and floor configuration, and enter the planned basement area if applicable. Check the estimated covered area against your drawings. Select the work you want to price and review the quantity, unit rate and amount for each line.

Which grey structure costs should you compare?

Compare excavation and foundation work, masonry, concrete and reinforcement, labour, concealed services, and roof work. Check which items each contractor includes. Keep interior finishing such as paint, cabinetry and final fittings in a separate budget when those items are outside the quoted scope.

Budget, A Quality and Premium materials

Compare individual items such as brickwork and waterproofing. For structural materials, compare supplier rates for the grade and specification shown on your approved drawings. Ask if prices include delivery, unloading, taxes and wastage.

Contractor quotes in Lahore, Gujranwala and Sialkot

Use quotes delivered to the actual plot. A narrow access road can increase handling, while a difference in site levels can change excavation, disposal and fill quantities. Check labour and material inclusions before comparing the price per square foot.

Worked example

At an illustrative PKR 23 per brick, 10,000 bricks cost PKR 230,000. Add delivery or laying labour if quoted separately. Compare the full priced scope before dividing by covered area to estimate a cost per square foot.

Frequently asked questions

Is the BOQ subtotal a full construction quote?
The subtotal adds priced selections. Check unpriced items, allowances and contractor exclusions before relying on it.
How do I save the house BOQ?
Open Print / Save PDF, enter your name and mobile number, then choose Save as PDF in the print dialog. Enter a separate WhatsApp number if applicable.

Related tools

Save your BOQ

Calculate Simply records your details with this PDF request. Privacy policy