Use the Grey Structure Cost Calculator to prepare an itemised budget for a house in Lahore, Gujranwala or Sialkot. Start with the plot and floor configuration, choose materials line by line, and see how quantities and unit rates affect the subtotal.
What a grey structure BOQ covers
A bill of quantities (BOQ) lists the work, its estimated quantity, the unit of measurement and the applicable rate. The calculator groups foundation and damp protection, masonry, concrete and reinforcement, labour, rough-in services and roof work. Check the line items to see which options you selected and what needs a separate quote. Paint, cabinets and other interior finishes belong in a separate budget.
How to estimate your house construction cost
Enter the plot depth below road level to unlock the calculator. Select the plot size and number of floors. If the house has a basement, enter its planned area. Check the estimated covered area against your drawings before choosing materials. Then select the work and quality tier you want to price. Review the subtotal and any pending lines before opening Print / Save PDF.
Compare Budget, A Quality and Premium
Mix tiers across line items to see the effect of individual choices. For example, compare two waterproofing options while keeping the same masonry selection. For structural items, use specifications from the approved drawings when comparing supplier quotes. Ask each supplier to clarify taxes, transport, unloading and the measurement unit.
A worked BOQ example
Suppose a contractor quotes PKR 23 per brick and the verified takeoff is 10,000 bricks. The brick line would be PKR 230,000 before any separately quoted delivery, wastage or laying labour. These are example figures. Apply the same quantity-times-unit-rate check to cement bags, reinforcement in kilograms and sand or crush in cubic feet.
Why Lahore, Gujranwala and Sialkot totals can differ
Even with the same design, supplier distance, unloading access and labour scope can change what you pay. A narrow street may require a smaller delivery vehicle or extra handling. A different site level can change excavation and fill quantities. Compare quotes delivered to the actual site and confirm who pays for extras such as soil removal.
Use the PDF to compare contractor quotes
When you choose Print / Save PDF, enter your name and mobile number. Add a separate WhatsApp number if applicable. Construction follow-up has its own consent checkbox. Compare the PDF and contractor quotation line by line, including quantities, material grades, labour scope and exclusions. An unpriced item may still be required, so confirm it before relying on the subtotal.
Can I estimate a 5 marla, 10 marla or 1 kanal house?
Yes. Start with the relevant plot size and floor configuration. Two houses on equal-size plots can have different covered areas and reinforcement quantities. Use the calculator for budgeting and reconcile its allowances with your drawings, contractor scope and delivered material quotes before ordering.
