Calculate Simply · All tools

Grey Structure Cost Calculator 2026 for Islamabad & Rawalpindi

Compare Budget, A Quality and Premium rates and print your grey structure BOQ.

Pile work is excluded from this BOQ.

Step 1 · Enter your plot depth

Enter 0 if your plot is level with the road. Enter your plot depth to unlock the BOQ options.
Measured quantities and site levels

Enter quantities from your drawings. Blank fields use preliminary budgeting allowances.

House configuration

How covered area is estimatedUses 225 sq ft per marla. Floor areas are budgeting assumptions. The 5 marla example uses 800 + 800 + 300 sq ft. The 1 kanal example uses 65% each for ground and first, plus a 300 sq ft allowance when selected. Actual permitted coverage and floors depend on the authority, scheme, phase, plot dimensions and setbacks. The second-floor allowance is a costing input.References: LDA · DHA Lahore · CDA. Available material quantities scale from the DHA Phase 8 reference BOQ (5,273 sq ft).

Choose materials

Tap a material option to include it.

This is a tentative BOQ. Quantities, rates and scope may change when the structural design or project location varies. Pile work is excluded from this BOQ.

Brick Constructions

Order waterproofing products and construction materials in Lahore and across Punjab, or discuss your house design or construction project.

WhatsApp for materials WhatsApp for design or construction +923390004805

Practical guide

Use the Islamabad–Rawalpindi grey structure BOQ to budget excavation, raft, reinforcement, masonry and labour. Start with the site levels and house configuration, then replace available allowances with measured quantities from your project.

Start with site levels and measured quantities

Enter the ground level below the road and check the formation level and excavation footprint. An 800 sq ft excavation footprint is a separate input from the total covered area over all floors. Review cushion and PCC blinding quantities before pricing raft concrete and reinforcement.

Read the reinforcement lines separately

The BOQ separates raft, columns and lintel-level tie beams from slab and supporting-beam steel. The slab and beam estimate uses a budgeting factor of 1.8 kg per sq ft of covered area. Use the approved bar bending schedule for procurement, including the required bar sizes and detailing.

Estimate a basement and check site exclusions

Enter the planned basement area. Check excavation, base slab, retaining walls, waterproofing and stairs against the drawings. Confirm working space, rock excavation, disposal, shoring and dewatering separately where applicable. Pile work is excluded.

Compare material rates and labour scope

Compare rates delivered to your plot, and ask which labour activities are included. Review the BOQ line by line with the contractor. Soil conditions, retaining works and contractor exclusions can make two houses with the same covered area cost different amounts.

Worked example

For a budgeting example, 1,600 sq ft × 1.8 kg/sq ft gives 2,880 kg for slabs and supporting beams. That figure covers those lines only. Compare the complete reinforcement scope against the drawings before placing an order.

Frequently asked questions

Can I use one rate per square foot for every Islamabad house?
Use that figure as a comparison after checking covered area and scope. Excavation, basement work and reinforcement allowances can vary with the project.
What goes into the printable BOQ?
The report lists selected items and prices. Review unpriced items and exclusions before using its subtotal to compare offers.

Related tools

Save your BOQ

Calculate Simply records your details with this PDF request. Privacy policy